Scroll to top
de en

Inspection Train in Shenzhen

The comprehensive inspection vehicle can be equipped with a perfect detection system. The inspection train in Shenzhen is suitable for the comprehensive inspection tasks on the subway line.

Technical Parameters

Current System DC 1500 V (Pantograph)
DC 800 V (Battery)
Transmission AC-DC
Axle Arrangement Bo-Bo
Axle Load 13,5 t
Traction Power 300 kW (Overhead Line)
240 kW (Battery)
Max. Speed 80 km/h (Overhead Line)
40 km/h (Battery)
Starting Effort 62 kN
Min. Curve Negotiation Radius 100 m